Municipal Waste
Sustainable Incineration In Papua New Guinea
Summary Complete mining camp waste disposal incineration solution for the largest active mining operation in Papua New Guinea. G500 Containerised Incineration Facility Automated Loading Systems Destroys Up To 500kg Waste An Hour Protects Against Environmental Damage Dispose Of General/Municipal Campsite Waste Support Regulatory Oversights Disposing of the waste at Papua New Guineas’ Largest Mine Addfield…
Read MoreRestoring The Petrochemical Industry
Summary Advanced oil contamination and campsite waste incinerator developed for one of the world’s leading oil and gas companies. G20 Containerised Incineration Facility Automated Loading Systems Optimised Contaminated Waste disposal Prevent Environmental Damage Dispose Of General Campsite Waste Support Regulatory Oversights Ecological Contaminated Waste Incinerator Keeping the environment clean during oil extraction has become essential…
Read MoreMedical Waste Management Facility
Summary 1000 Kilogramme an hour hazardous waste incinerator installed on the Isle of Wight. C1000 Hazardous Waste Incineration Facility Stepped Hearth Incinerator Hydraulically Powered Automatic Loading Waste Oil Recycling Burners Integrated Into Existing Municipal Waste Systems Sophisticated Central Control Systems How Proper Waste Management Protects the Environment In 2006, Addfield successfully installed a state-of-the-art medical…
Read More